Premier Co-op recently completed construction of a feed mill, where PDC Electrical Contractors assisted with the design and installation of the electrical system. It included 129 motors and 304 control points from 20 feet below grade to 170 feet above grade. A safety system monitored four individually wired safety devices, such as speed switches, bearing temperature switches and product flow switches. Approximately 20,000 feet of raceway was installed and 152,000 feet of wire and cable was pulled for power and control. After testing of the 304 field devices, the final commissioning took place without any startup issues or wiring mistakes.