Projects of Distinction

Can't find what you're looking for?

08/03/2023

DeLeers Construction worked closely with the designers on this 4,100 square foot veterinary clinic to create an efficient workflow for...

Read More

08/03/2023

Quality Insulators, Inc. completed the insulation of the Farm Wisconsin Discovery Center HVAC systems at Lakeshore Technical College. The facility...

Read More

08/03/2023

This 17,300-square-foot roof section at the UW Health complex included the demolition and removal of an existing ballasted roofing system...

Read More

08/03/2023

The Great Lakes Energy Education Center at NWTC was designed on a tight budget to be zero net energy capable,...

Read More

08/03/2023

Springs at Sun Prairie is a multi-family complex with 228 units in 12, two-story apartment buildings. Using innovative GPS technology,...

Read More

08/03/2023

Masters Gallery Foods’s new 187,000-square-foot cheese cutting and shredding facility serves the needs of customers around the world. The facility...

Read More

08/03/2023

The Duraform Lane Facility was a $7.8 million, 97,500-square-foot facility designed for a unique manufacturing process, which provided some unusual...

Read More

08/03/2023

NAMI performed more than 62,000 work hours on the mechanical systems at the 192,000-square-foot UW-La Crosse Prairie Springs Science Center....

Read More

08/03/2023

Premier Co-op recently completed construction of a feed mill, where PDC Electrical Contractors assisted with the design and installation of...

Read More

08/03/2023

Klondike recently completed a major 36,000-square-foot addition to its existing cheese plant to enable the tripling of production output. A...

Read More