The city of Fort Atkinson’s new fire station project was a two story addition, demo and remodel. Phasing the design and construction allowed the 24/7 fire department to be fully functional during the entire 16-month schedule, avoiding relocation costs or new land purchase. Keller, Inc. conducted an extensive needs assessment revealing a larger-than-expected list to bring the current facility up to date and adequately provide space for an evolving staff and future growth. The parking lot was reconfigured to allow a new two-story addition that would house the public entry, necessary offices, enlarged training area, new restrooms and dormitory and living spaces for overnight staff. The city hoped the new facility would blend well with the existing police facility while still creating its own identity and minimizing maintenance. Interior and exterior materials were selected to accomplish this as well as provide durability, longevity and a contemporary look.